High-Strength, Non-Shrink Epoxy Grout for Precision Equipment and Anchor Bolt Applications A high-performance, three-component epoxy grouting system featuring 100% solids, solvent-free formulation. Combines deep-pour capability, high early strength, and zero shrinkage for machinery baseplates, anchor bolts, and dynamic equipment foundations. Ideal for crane rail, industrial plants, wind turbines, and precision alignment applications under harsh conditions.

Review technical parameters
SINO-SINAEGM-100 Epoxy GroutVerified product main image pending
Product main image pending source upload

Product overview

Performance and application overview.

EGM-100 Epoxy Grout is a high-performance, 100% solids, non-shrink epoxy grout designed for deep pour, heavy-duty anchoring and baseplate grouting applications. With excellent early and ultimate strength, superior bond to concrete and steel, and outstanding chemical resistance, it is ideal for use in industrial foundations, anchor bolt grouting, wind turbine baseplates, and dynamic equipment installations.

Formulated for long working time and low exotherm, EGM-100 enables safe, single-pour depths up to 2 meters. It meets ASTM standards including ASTM C579 for compressive strength, ASTM C882 for bond strength, and is engineered to perform in harsh environments requiring vibration-resistant, deep pour epoxy grouting systems.

Technical parameters

Original product values for technical screening.

Values are reproduced without keyword editing. Final selection must follow the current approved technical data sheet, test method and project conditions.

The source page publishes a value or range but does not identify it as a minimum or a typical result. It is therefore retained as a published value pending TDS confirmation.

PropertyValueTest Standard
Flowability≥230 mmASTM C138 / GB Method
Working Time50–70 minASTM D2471
Compressive Strength1d: ≥50 MPa3d: ≥65 MPa7d: ≥95 MPaASTM C579 B
Flexural Strength≥20 MPa @ 7dASTM C580
Bond to Concrete≥3.0 MPaASTM C882
Density (A+B+C)2.1 – 2.2 kg/LASTM D792
Operating Temperature Range-50°C to +80°CInternal Test

Technical brochures & references

Supporting product material.

These brochure and reference pages support technical review but are intentionally not used as product main images. Refer to the approved TDS and report for acceptance values.

Product usage

Application and installation guidance.

Applications

1.Grouting for compressors, turbines, pumps, presses.

2.Precision rail track bed and bridge bearing grout.

3.Anchor bolt grouting and rebar fixing.

4.Heavy machinery baseplate leveling.

5.Corrosion-resistant foundation grouting in chemical plants.

6.Structural repair and crack control in dynamic load environment.

Installation Guidelines

Surface Prep: Clean to SSPC-SP6; concrete ground to 25 mm chamfer.

Surface Prep: Clean to SSPC-SP6; concrete ground to 25 mm chamfer.

Formwork: Minimum 100 mm gap; apply release agent.

Formwork: Minimum 100 mm gap; apply release agent.

Mixing: ●Mix A+B at 200–250 rpm for ~3 min ●Add C and mix at 15–20 rpm for 5–10 min

Mixing:

●Mix A+B at 200–250 rpm for ~3 min

●Add C and mix at 15–20 rpm for 5–10 min

Pouring: Continuous pour (25–35 mm layers); use gravity feed for >1.5 m deep.

Pouring: Continuous pour (25–35 mm layers); use gravity feed for >1.5 m deep.

Curing: Forms removed after final set; finish before initial set.

Curing: Forms removed after final set; finish before initial set.

Setting Times

18 °C: initial ~3 h; final ~72 h

18 °C: initial ~3 h; final ~72 h

25 °C: ~2 h initial; ~48 h final

25 °C: ~2 h initial; ~48 h final

32 °C: ~1.5 h initial; ~36 h final

32 °C: ~1.5 h initial; ~36 h final

Packaging & Storage

●A:B:C kit ratio ~3:1:20 by weight (≈200 kg total)

●Store in dry, ventilated area; shelf life 18 months

Safety Notes

Low toxicity, VOC-free. Use PPE and ventilate. Rinse with water if contact occurs.

Technical enquiry

Check whether EGM-100 Epoxy Grout matches your project.

Include foundation type, grout geometry and volume, strength ages, flow requirement, temperature, standards, placement distance and equipment.