Specialized materials for critical infrastructure
info@wcrete.comWhatsApp +86 153 7387 2353

Project references

Wind foundation grout under real site constraints.

Project references are organized by climate, foundation route and material decision so engineers can find the most relevant precedent.

01

Cold-climate onshore wind

Kaisa Mulei Shisigejingzi 800 MW Wind Power Project

CBGM antifreeze high-strength non-shrink grout

A project reference for winter installation, pumpability, early strength and frost-durability planning.

02

Severe winter construction

Harbin Binxian Phase II 150 MW Wind Power Project

CBGM antifreeze wind turbine grout

Used as a reference for wind foundation grouting where winter temperatures may fall below −20°C.

03

Onshore turbine foundations

CGN Inner Mongolia Chifeng 100 MW Wind Power Project

CBGM high-strength non-shrink grout

An onshore reference supporting the use of pumpable grout in baseplate and anchor-cage load-transfer zones.

04

Distributed onshore wind

Yuzhong Gongjing 45 MW Distributed Wind Power Project

CBGM wind turbine foundation grout

A project example for high-flow placement and strength-grade selection in onshore foundations.

05

High-altitude wind energy

Tibet Qiongjie 60 MW High-Altitude Wind Farm

Ultra-high-strength wind grout and protective systems

A high-altitude application reference combining foundation grout selection with exposure-driven protection.

Technical enquiry

Looking for a reference project with similar conditions?

Include foundation type, grout geometry and volume, strength ages, flow requirement, temperature, standards, placement distance and equipment.